Custom Models, Metrics & Metric Baskets
Custom Models and Metrics
Where an organisation tracks an activity that sits outside the IES, custom models and output-only custom metrics can be created to capture it. Speak to the Thrive team before setting these up, as you will need Super User permissions.
Creating a custom model
- Select + Create Model underneath the model list.
- In the Create Model window, enter a name in the Model name field (this is required).
- Select Create Model to save, or Cancel to close the window without saving.
Figure 6 The Create Model window
The new model is added to the model list and opens automatically. As it is empty, a Get Started message is shown.
Figure 7 A newly created custom model, ready for content to be added
- Select the + button at the top right of the model to begin adding impact areas, groups and metrics.
- Build up the structure you need, adding impact areas first, then groups within them, then metrics within each group.
Creating a custom metric
Adding a metric opens the Create Metric panel. This is a two-step process, shown on the left of the panel: 1. Configure your metric, then 2. Map your metric, which places it within your model.
Figure 8 Step 1 of the Create Metric panel: Configure your metric
|
Field |
What to enter |
|
Metric Code |
A short, unique code for the metric. |
|
Metric Name |
The full name of the metric, as it will appear in the library. |
|
Metric Type |
Select the type of metric from the dropdown. |
|
Unit of Measurement |
What is being counted, for example hours, people or pounds. |
|
Social Value Proxy |
Select a proxy value from the dropdown, where one applies. |
|
Metric Description for Admin |
Guidance for administrators on how the metric should be used. |
|
Metric Description for Data Collector |
Plain-language instructions shown to the people entering data. |
|
Allow negative values |
Tick if a negative figure can be entered. |
|
Requires Comment |
Tick to make a comment mandatory with each submission. |
|
Requires Evidence |
Tick to make supporting evidence mandatory with each submission. |
|
Tip Write the Data Collector description with the person entering the data in mind. Clear instructions at this stage lead to more consistent submissions and fewer rejected records later. |
Metric Baskets
Frequently used metrics can be grouped into a metric basket, for example an organisation's top 20 metrics. A basket can then be pulled into a project or estimate in a single action, rather than selecting each metric individually every time.